Sub-base Kit

Product Code: LOG18580
Stock 2-3 Days

Product Description

Required for 265V unit.The fully skirted sub-base conceals wiring and provides strong support. Plug-in receptacle and field-wiring access speed installation.Electrical accessories meet NEC requirements; can be installed in the unit sub-base.Sub-base may be installed onto wall sleeve either before or after sleeve installation.Minimum clearance between wall sleevebottom and finished floor is 3 3/4”; maximum height clearance from bottom of wall sleeve and finished floor is 5”.Minimum clearance between wall sleeve flange and finished wall is 2 3/4”.
  • PTSB320E : 230/208V, 15/20A
  • PTSB330E : 230/208V, 30A
  • PTSB420E : 265V, 15/20A
  • PTSB430E : 265V, 25A
  • PTSB000E : Non-Electrical  

Sub-base Kit

Sub-base Kit

12/11/2024

Write a review

Note: HTML is not translated!
Bad           Good

When you order from LodgingGoods.com, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to travel from our warehouse to your destination.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!